QUESTION IMAGE
Question
during a crane inspection, which of the following must be inspected? select all that apply. clearance for swing radius slings load capacity wire rope wear and sheaves
Brief Explanations
During a crane inspection, clearance for swing radius (to ensure safe operation space), slings (as they are crucial for lifting), load capacity (to know the crane's safe lifting limit), and wire rope wear and sheaves (as worn - out ropes or sheaves can cause failures) are all important components to check.
Snap & solve any problem in the app
Get step-by-step solutions on Sovi AI
Photo-based solutions with guided steps
Explore more problems and detailed explanations
Clearance for swing radius, Slings, Load capacity, Wire rope wear and sheaves