during a crane inspection, which of the following must be inspected? se…

Question

during a crane inspection, which of the following must be inspected? select all that apply. clearance for swing radius slings load capacity wire rope wear and sheaves

Explanation:

Brief Explanations

During a crane inspection, clearance for swing radius (to ensure safe operation space), slings (as they are crucial for lifting), load capacity (to know the crane's safe lifting limit), and wire rope wear and sheaves (as worn - out ropes or sheaves can cause failures) are all important components to check.

Answer:

Clearance for swing radius, Slings, Load capacity, Wire rope wear and sheaves