QUESTION IMAGE
Question
project completion
the equation for the line of best fit is shown below.
y = -\frac{5}{4}x + 27.5
based on the line of best fit, what is the expected time for completion with 14 workers on the project?
a. 10 days
b. 7.5 days
c. 8.5 days
d. 12 days
Step1: Identify x value
x = 14 (workers)
Step2: Substitute into equation
$y = -\frac{5}{4}(14) + 27.5$
Step3: Calculate first term
$-\frac{5}{4}×14 = -17.5$
Step4: Compute total y
$-17.5 + 27.5 = 10$? Correction: Wait, $-\frac{5}{4}×14 = -17.5$, $27.5 -17.5=10$? No, wait original equation: $y=-\frac{5}{4}x +27.5$. $-\frac{5}{4}×14 = -17.5$, $27.5-17.5=10$? But option B is 7.5. Wait, maybe typo? Wait no: $-\frac{5}{4}×14 = -17.5$, 27.5-17.5=10, but option A is 10. Wait wait, check again: Oh no, maybe I misread the equation? The equation is $y=-\frac{5}{4}x +27.5$. 14 workers: $y= -1.25×14 +27.5 = -17.5 +27.5=10$. So answer A? Wait but the options have A as 10. Oh yes, so correct answer is A. 10 days.
Wait correction:
Step1: Assign x=14
x = 14
Step2: Substitute into formula
$y = -\frac{5}{4}(14) + 27.5$
Step3: Calculate linear term
$-\frac{5}{4}×14 = -17.5$
Step4: Sum to get y
$-17.5 + 27.5 = 10$