Sovi.AI - AI Math Tutor

Scan to solve math questions

QUESTION IMAGE

this graph shows how the time required to screen - print a batch of shi…

Question

this graph shows how the time required to screen - print a batch of shirts is related to the number of shirts in the batch. screen - printing shirts how long does it take to screen - print a batch of 5 shirts? 8 minutes 4.5 minutes 7.5 minutes 9.5 minutes

Explanation:

Step1: Locate the number 5 on the x - axis (Number of shirts).

Move vertically from \(x = 5\) until you reach the line on the graph.

Step2: Move horizontally from the point on the line to the y - axis (Time in minutes).

Read the value on the y - axis.

Answer:

7.5 minutes