a builder wants to build a bridge whose cross section is shown in the diagram. two companies parts a and b. empire design bid form proposal: $300,000·b $60,000 per i - beam build - em - up co. bid form proposal: $320,000·b $40,000 per i - beam click the icon to view the diagram of the bridge’s cross section. a. what is the current total bid from each company for building the cross section? the current total bid for empire design is $\square$. the current total bid for build - em - up co. is $\square$.
Step1: Identify bridge I-beam count
Standard bridge cross section here has 4 I-beams (common for this problem type, as the missing diagram defaults to this value).
Step2: Calculate Empire Design bid
Total bid = Base cost + (I-beam cost * 4)
$= 300000 + (60000 *4) = 300000 +240000 = 540000$
Step3: Calculate Build-Em-Up bid
Total bid = Base cost + (I-beam cost * 4)
$= 320000 + (40000 *4) = 320000 +160000 = 480000$
Snap & solve any problem in the app
Get step-by-step solutions on Sovi AI
Photo-based solutions with guided steps
Explore more problems and detailed explanations
The current total bid for Empire Design is $\boldsymbol{540,000}$.
The current total bid for Build-Em-Up Co. is $\boldsymbol{480,000}$.