QUESTION IMAGE
Question
question 17 of 25
an engineering technician makes $25 an hour for the first 40 hours she works during a week and $32 an hour for each hour over 40 hours. which piecewise equation models her total weekly pay y in dollars as it relates to the number of hours x that she has worked during the week?
a. $y = \
$
b. $y = \
$
c. $y = \
$
d. $y = \
$
Step1: Analyze pay for \( 0 \leq x \leq 40 \)
For the first 40 hours, the rate is $25 per hour. So pay \( y = 25x \) (since total pay = rate × hours).
Step2: Analyze pay for \( x > 40 \)
For hours over 40, she gets $25 for the first 40 hours (total LXI0 ) and $32 for each additional hour (\( x - 40 \)). So total pay \( y = 32(x - 40) + 1000 \).
Step3: Evaluate options
- Option A: Wrong, as over 40 hours should include the first 40 hours' pay, not just \( 32x \).
- Option B: Wrong, as it doesn't include the $1000 from the first 40 hours.
- Option C: Wrong, the over - 40 formula is incorrect (should be based on additional hours, not \( 32x+1000 \)).
- Option D: Correct, matches the derived formulas for both intervals.
Snap & solve any problem in the app
Get step-by-step solutions on Sovi AI
Photo-based solutions with guided steps
Explore more problems and detailed explanations
D. \( y =
\)