QUESTION IMAGE
Question
required information
use the following information for the quick study below. (algo)
the following information applies to the questions displayed below
batco makes baseball bats. each bat requires 2.00 pounds of wood at $18 per pound and 0.25 direct labor hour at $20
per hour. overhead is assigned at the rate of $40 per direct labor hour.
qs 21 - 6 (algo) total cost variances lo p2
assume the actual cost to manufacture 150 bats is $8,100. compute the total cost variance and identify it as favorable or unfavorable
note: indicate the effect of the variance by selecting favorable, unfavorable, or no variance.
Step1: Calculate the budgeted standard cost
- Material cost: Each bat needs \(2\) pounds of wood at \(\$18\) per pound. For \(150\) bats, material cost \(=150\times2\times18=\$5400\)
- Labor cost: Each bat needs \(0.25\) direct - labor hours at \(\$20\) per hour. For \(150\) bats, labor cost \(=150\times0.25\times20=\$750\)
- Overhead cost: Overhead is assigned at \(\$40\) per direct - labor hour. Labor hours for \(150\) bats \(=150\times0.25 = 37.5\) hours. Overhead cost \(=37.5\times40=\$1500\)
- Budgeted standard cost \(=5400 + 750+1500=\$7650\)
Step2: Calculate the total cost variance
Total cost variance \(=\text{Actual cost}-\text{Budgeted standard cost}\)
Actual cost \(=\$8100\), Budgeted standard cost \(=\$7650\)
Total cost variance \(=8100 - 7650=\$450\)
Snap & solve any problem in the app
Get step-by-step solutions on Sovi AI
Photo-based solutions with guided steps
Explore more problems and detailed explanations
| Item | Amount | Variance |
|---|---|---|
| Budgeted standard cost | \(\$7650\) | |
| Total cost variance | \(\$450\) | Unfavorable |