which of these is a reason an engineer may choose to use a prefabricated building component?
a. she wants to try out a new material that is not typically used.
b. she wants to reduce costs.
c. the client wants the building to be one of a kind.
d. she is not on a strict timeline.
Prefabricated building components are made in factories in advance. Mass - production in factories often leads to cost - savings due to economies of scale. New materials (A) are less likely to be used in prefabricated components as they are usually standardized. A "one - of - a - kind" building (C) would require custom - made, not prefabricated, components. Prefabricated components are used to speed up construction, so being on a non - strict timeline (D) is not a reason.
Snap & solve any problem in the app
Get step-by-step solutions on Sovi AI
Photo-based solutions with guided steps
Explore more problems and detailed explanations
B. She wants to reduce costs.