match the delivery performance item to its definition. for each option select the best answer choice.
cost of quality the total cost to ensure req
work breakdown structure choose
decomposition of all required scope items
the degree to which a set of inherent characteristics fulfills requirements
the total cost to ensure requirement conformance
a condition or capability necessary to be delivered by the project
a checklist of criteria that must be met in order for a deliverable to be considered complete
requirement
quality the degree to which a set o
definition of done a checklist of criteria that m

Explanation:

Brief Explanations
  • Cost of Quality: Matches with "The total cost to ensure requirement conformance" as it refers to the costs associated with ensuring that products or services meet requirements.
  • Work Breakdown Structure: Matches with "Decomposition of all required scope items" as a WBS breaks down the project scope into manageable components.
  • Requirement: Matches with "A condition or capability necessary to be delivered by the project" as requirements define what the project must deliver.
  • Quality: Matches with "The degree to which a set of inherent characteristics fulfills requirements" as quality is about how well something meets requirements.
  • Definition of Done: Matches with "A checklist of criteria that must be met in order for a deliverable to be considered complete" as the DoD is a set of criteria for a deliverable to be done.

Answer:

  • Cost of Quality: The total cost to ensure requirement conformance
  • Work Breakdown Structure: Decomposition of all required scope items
  • Requirement: A condition or capability necessary to be delivered by the project
  • Quality: The degree to which a set of inherent characteristics fulfills requirements
  • Definition of Done: A checklist of criteria that must be met in order for a deliverable to be considered complete