during a crane inspection, which of the following must be inspected? select all that apply. clearance for swing radius slings load capacity wire rope wear and sheaves if you need to review this content, it can be found in the using cranes safely module of the cranes topic.

Explanation:

Brief Explanations

During crane inspection, clearance for swing radius ensures safe operation space, slings are crucial for load - handling, load capacity determines what can be safely lifted, and wire rope wear and sheaves affect the crane's lifting mechanism integrity. All these are important components to inspect for safe crane operation.

Answer:

Clearance for swing radius, Slings, Load capacity, Wire rope wear and sheaves